120 minutes fire paint for steel
Thank you for your enquiry, to enable us to be able to advise, please provide us with as much of the following information as possible;
- Level of fire protection required (i.e. 30, 60, 90min, etc.)
- Each steel section dimension (i.e. 254x146x37 UB)
- Quantity and length of each section (or overall meterage for each section)
- Orientation (horizontal or vertical)
- Number of sides to be painted (all sides, 3 sides, 1 flange, etc.)
- Environment (internal, external, car park, chemical exposure, etc.)
- Application on site or in shop
Alternatively you can just forward us drawings, fabrication/cutting lists and we'll extract the information from them but in that instance we'd need some guidance as to what to allow for i.e. all steels on first floor, etc.