- There are no more items in your cart
- Shipping Calculated at checkout
-
Sub-Total (inc. VAT)
£0.00
Sherwin-Williams Transgard TG111V2 is a high build 2-pack epoxy zinc phosphate primer/buildcoat, designed as anti-corrosive protection of carbon steel surfaces prepared by abrasive blast cleaning.
- High build 2-pack epoxy
- Designed as anti-corrosive protection of carbon steel surfaces
- Can be applied at thicknesses between 75 and 150 microns dry to provide both primer and buildcoat in a single coat
- Please Note: This product is made to order and is therefore subject to a minimum order quantity of 150L and an extended lead time of up to 98 working days
- Delivery pricing and timescales will be confirmed on request
- Please contact our sales team on 0113 2455450 or send a message to [email protected] for details
Sherwin-Williams Transgard TG111V2 is a high build 2-pack epoxy zinc phosphate primer/buildcoat, designed as anti-corrosive protection of carbon steel surfaces prepared by abrasive blast cleaning.
Transgard TG111V2 can be applied at thicknesses between 75 and 150 microns dry to provide both primer and buildcoat in a single coat. A topcoat is only required for decorative purposes. Without a topcoat, the material will quickly discolour and patchiness may be exaggerated due to film thickness variation, but the coating will nonetheless provide excellent anti-corrosive protection as a single coat protective epoxy and the intercoat adhesion will not be affected by any discolouration.
Please Note: This product is made to order and is therefore subject to a minimum order quantity of 150L and an extended lead time - please contact our sales team on 0113 2455450 or send a message to [email protected] for details.
Endorsements
Highways Agency Item No. 111.
Recommended Topcoats
For overcoating with epoxy products (including self overcoating), the maximum recommended interval is 28 days at 23°C. For overcoating outside this interval, consult Sherwin-Williams technical support for advice.
Where a high degree of gloss and colour retention is required, overcoat with Acrolon C137V2 or Transgard TG169 within 7 days at a minimum d.f.t. of 50 microns. These overcoating times refer to achievement of optimum adhesion at 23°C and will vary with temperature.
For overcoating outside the above parameters, consult Technical Team for advice.
Surface Preparation
Blast clean to Sa21⁄2 BS EN ISO 8501-1:2007). Average surface profile in the range 50-75 microns.
Manually prepared surfaces should be prepared to a minimum standard of St3 ISO 8501-1:2007 at the time of coating.
Ensure surfaces to be coated are clean, dry and free from all surface contamination.
May also be applied over a wide range of pre-fabrication primers, including inorganic zinc silicate, and epoxy types.
Data sheet
- Manufacturer
- Sherwin-Williams
- For Use By
- Industrial Use
- Water / Solvent Based
- Solvent
- For Use On
- Carbon Steel
- Application Method
- Airless Spray, Spray, Brush, Roller
- Sheen
- Matt
- Colour
- Standard / Ready Mixed
- Single, Two or Three Pack
- Two-Pack
- Product Certifications
- Highways Agency Item No. 111
- Pack Size
- 5L
- Coverage
- 7.5m² per litre
- Touch Dry
- 1.5 Hours
- UN Number (Activator)
- UN3469
- UN Number (Base)
- UN1263
- Base Type
- Solvent-Based Epoxy
- Suitable For Use On
- Carbon Steel
- Finish
- Matt
- Application Method
- Brush
- Application Method
- Roller
- Application Method
- Spray
- Product Usage Type
- Primer
- Product Range
- Transgard
- Colour Family
- Red
- Industry Approved System
- Highways
Questions
Question about the product
Be the first to ask a question about this product!
IMPORTANT SHIPPING & DELIVERY INFORMATION
Sherwin-Williams Transgard TG111V2 is only available with the shipping and delivery timescales listed below - please do not contact our Customer Support Team with enquiries about alternative or earlier shipping and delivery times.
Saturdays and Sundays, as well as Bank Holidays, are not classed as working days.
Orders placed after the cut-off for this product will not be processed for earliest dispatch until 9am the next working day.
All delivery costs below are excluding VAT