Follow us on:

PPG PhenGuard Subsea 610 | Marine Paints

PPG PhenGuard Subsea 610

PPG4868
PPG4868

PPG PhenGuard Subsea 610 is a two-component, high-build, amine adduct-cured novolac phenolic epoxy primer.

  • Subsea primer for 2-coat system with PHENGUARD SUBSEA 780.
  • Excellent resistance to high temperature cathodic protection.
  • Meets the requirements of Norsok M-501 rev. 6, system 7C (180°C / 356°F).
  • Excellent resistance to seawater immersion.
  • Very good corrosion control.
  • Good application properties.
Colour
Size
Finish
£112.34(incl. VAT)
£93.62(ex. VAT)
Quantity
Please choose your colour
Available for Delivery (See Delivery Options Below)

No queries yet, leave the first!
Description

PPG PhenGuard Subsea 610 is a two-component, high-build, amine adduct-cured novolac phenolic epoxy primer.



Click To Jump To Section:




Features & Benefits


  • Subsea primer for 2-coat system with PHENGUARD SUBSEA 780.
  • Excellent resistance to high temperature cathodic protection.
  • Meets the requirements of Norsok M-501 rev. 6, system 7C (180°C / 356°F).
  • Excellent resistance to seawater immersion.
  • Very good corrosion control.
  • Good application properties.



Product Specification


Technical Data
PPG PhenGuard Subsea 610
Number of Components: Two
Mass Density: 1.7 kg/l (14.2 lb/US gal)
Volume Solids: 66 ± 2%
VOC (supplied): Directive 1999/13/EC, SED: max. 191.0 g/kg
max. 315.0 g/l (approx. 2.6 lb/US gal)
Recommended Dry Film Thickness: 175 μm (7.0 mils)
Theoretical Spreading Rate: 3.8 m²/l for 175 μm (151 ft²/US gal for 7.0 mils)
Dry To Handle: 8 hours
Overcoating Interval: Minimum: 3 hours
Maximum: 21 days
Shelf Life: Base: at least 24 months when stored cool and dry
Hardener: at least 24 months when stored cool and dry



Drying Times


Curing time for DFT up to 175μm(7.0mils)
Substrate temperature Dry To Handle Full Cure
10°C (50°F) 16 hours 5 days
15°C (59°F) 12 hours 4 days
20°C (68°F) 8 hours 3 days
30°C (86°F) 6 hours 48 hours



Overcoating interval for DFT up to 150 µm (6.0 mils)
Overcoating with: Interval 10°C (50°F) 15°C(59°F) 20°C (68°F) 30°C (86°F) 40°C (104°F)
Itself and PHENGUARD
Minimum 16 hours 6 hours 3 hours 3 hours 2 hours
Maximum 28 days 25 days 21 days 14 days 7 days



Surface Preparation


Substrate Conditions

  • Steel should be blast cleaned in situ to at least ISO-Sa2½
  • Blasting profile 50 – 100 μm (2.0 – 4.0 mils)
  • Steel must be free from rust, scale, shop primer and any other contamination

Substrate Temperature & Application Conditions

  • Substrate temperature during application and curing should be above 10°C (50°F)
  • Substrate temperature during application and curing should be at least 3°C (5°F) above dew point.



Application Methods


Mixing Ratio By Volume: Base To Hardener 88:12

  • The temperature of the mixed base and hardener should preferably be above 15°C (59°F), otherwise extra thinner may be required to obtain application viscosity.
  • Adding too much thinner results in reduced sag resistance and slower cure
  • Thinner should be added after mixing the components



Induction Time

Allow time before use.

Mixed product induction time
Mixed Product Temperature Induction Time
15°C (59°F) 20 minutes
20°C (68°F) 15 minutes
30°C (86°F) 10 minutes



Air Spray:

  • Recommended thinner: THINNER 91-92
  • Volume of thinner: 2 - 15%, depending on required thickness and application conditions
  • Nozzle orifice: 2.0 mm (approx. 0.079 in)
  • Nozzle pressure: 0.3 MPa (approx. 3 Bar; 44 p.s.i.)

Airless Spray:

  • Recommended thinner: Tap water
  • Volume of thinner: 2 - 10%, depending on required thickness and application conditions
  • Nozzle orifice: Approx. 0.46 – 0.53 mm (0.018 – 0.021 in)
  • Nozzle pressure: 15.0 - 20.0 MPa (approx. 150 - 200 bar; 2176 - 2901 p.s.i.)

Brush/Roller:

  • Brush: for stripe coating and spot repair only
  • Recommended thinner: THINNER 91-92

Volume Of Thinner

  • 2 – 10%

Cleaning Solvent



Health & Safety


  • This is a solvent-borne paint and care should be taken to avoid inhalation of spray mist or vapor, as well as contact between the wet paint and exposed skin or eyes.
  • For further information please see the safety data sheets in the attachments section above.

Click to go back to the top of the page

Product Details
4868-779593

Data sheet

Manufacturer
PPG
For Use On
Steel
Application Method
Brush, Roller, Spray
Sheen
Eggshell
Colour
Standard / Ready Mixed
Single, Two or Three Pack
Two-Pack
Pack Size
4L, 20L
Parts
Two
Mixing Ratio
Base to hardener 88:12
Dry to Handle (at 20°C)
8 hours
Fully Cured (at 20°C)
3 days
Coverage
3.8 m²/l for 175 μm (151 ft²/US gal for 7.0 mils)
Recommended Thinner/Cleaner
Thinner: THINNER 91-92 - Cleaner: THINNER 90-53
Density
1.7 kg/l (14.2 lb/US gal)
Solids by Volume
66 ± 2%
VOC
Directive 1999/13/EC, SED: max. 191.0 g/kg max. 315.0 g/l (approx. 2.6 lb/US gal)
Shelf Life (from date of manufacture)
Base: at least 24 months when stored cool and dry. Hardener: at least 24 months when stored cool and dry.
Finish
Eggshell
Recommended Dry Film Thickness
175 μm (7.0 mils)
UN Number (Activator)
UN3470
UN Number (Base)
UN1263
Suitable For Use On
Steel
Finish
Eggshell
Application Method
Brush
Application Method
Roller
Application Method
Spray
Product Usage Type
Primer
Product Range
PhenGuard
Colour Family
Grey
Attachments
Download


Customer agrees that before placing an Order, Customer has read and understood the most up to date Product Data Sheet for the Product. Where we have access to the Product Data Sheet from the manufacturer, we will either provide a copy on request, or include a link to the Product Data Sheet available on the manufacturer’s website. Customer further agrees that we have no liability for any errors or omissions contained within the Product Data Sheets. For more information, please see our Terms & Conditions of Sale.

Questions

Question about the product

* Required fields
(read)

Be the first to ask a question about this product!

IMPORTANT SHIPPING & DELIVERY INFORMATION

PPG PhenGuard Subsea 610 is only available with the shipping and delivery timescales listed below - please do not contact our Customer Support Team with enquiries about alternative or earlier shipping and delivery times.

Saturdays and Sundays, as well as Bank Holidays, are not classed as working days.

Orders placed after the cut-off for this product will not be processed for earliest dispatch until 9am the next working day.

All delivery costs below are excluding VAT


You might also like
PPG Thinner 90-53 | Paint Thinner

PPG Thinner 90-53

This thinner has been developed by PPG Protective and Marine Coatings for use with selected paint products.

Price £42.59 (incl. VAT)
Shop now
Trustpilot
In Stock and Available for Delivery
PPG Thinner 91-92

PPG Thinner 91-92

This thinner has been developed by PPG Protective and Marine Coatings for use with selected paint products.

Price £42.59 (incl. VAT)
Shop now
Trustpilot
In Stock and Available for Delivery
PPG PhenGuard Subsea 780 | Marine Topcoats

PPG PhenGuard Subsea 780

2-component, amine adduct-cured phenolic epoxy finish, used for the protection of subsea equipment. Also known as Subsea 780 and Sigmaline 780. Qualified for NORSOK M501 Rev.6 System 7C up to 150°C with 3 coating system (Phenguard 930 / 935 / Phenguard Subsea 780 system). Qualified for NORSOK M501 Rev.6 System 7C up to 180°C with 2...

Price £112.34 (incl. VAT)
Shop now
Trustpilot
In Stock and Available for Delivery