- There are no more items in your cart
- Shipping Calculated at checkout
-
Sub-Total (inc. VAT)
£0.00
Fast-drying steel primer that provides corrosion protection on structural steel. Well suited for fabrication shops that need fast cure to dry and handle times.
- Rapid cure and fast-drying
- VOC compliant for most areas
- Good for filling properties on rough and pitted steel
Nullifire have made the decision in March 2023 to rebrand Nullifire PM020 High Build Alkyd Primer as Carboline Carbocoat 115 – please see a letter explaining the changes HERE.
Carboline Carbocoat 115 is a fast-drying steel primer that provides corrosion protection on structural steel. Well suited for fabrication shops that need fast cure to dry and handle times. May be top-coated with conventional alkyds or acrylics for colour, aesthetics or additional protection.
When applying a topcoat, Carboline Carbocoat 115 may be coated with Acrylics or Alkyds depending on exposure and need.
Click To Jump To Section:
- Features & Benefits
- Product Specification
- Film Thickness Range And Coverage
- Drying Times
- Surface Preparation
- Application Methods
- Application Conditions
- Health & Safety
Features & Benefits
- Rapid cure
- VOC compliant for most areas
- Good for filling properties on rough and pitted steel
- Fast dry to handle properties
Product Specification
Technical Data | ||||||
---|---|---|---|---|---|---|
Carboline Carbocoat 115 | ||||||
Volume Solids: | 51% +/- 2% | |||||
VOC Content: | As Supplied : 3.50 lbs./gal (419 g/l) | |||||
Thinner 10 : 6 oz/gal 3.65 lbs./gal (437 g/l) | ||||||
Dry Temperature Resistance: | Continuous: 200°F (93°C) | |||||
Non-Continuous: 250°F (121°C) | ||||||
Theoretrical Coverage Rate: | 818 ft²/gal at 1.0 mils (20.1 m²/l at 25 microns) | |||||
545 ft²/gal at 1.5 mils (13.4 m²/l at 38 microns) | ||||||
409 ft²/gal at 2.0 mils (10.0 m²/l at 50 microns) | ||||||
Dry Film Thickness: | 1.5 - 2 mils (38 - 51 microns) per coat - Do not exceed 3.0 mils in a single coat. | |||||
Topcoats: | May be coated with Acrylics or Alkyds depending on exposure and need | |||||
Storage Temperature & Humidity | 40-110 °F (4-43 °C) - 0-90% Relative Humidity | |||||
Shelf Life | 24 months at 75 °F (24 °C) |
Drying Times
Curing Schedule | |||||
---|---|---|---|---|---|
Surface Temperature | Dry To Touch | Dry To Handle | Dry To Topcoat | ||
35°F (2°C) | 30 Minutes | 2 Hours | 4 Hours | ||
60°F (16°C) | 20 Minutes | 60 Minutes | 3 Hours | ||
75°F (24°C) | 10 Minutes | 30 Minutes | 2 Hours |
- These times are based on a 1.5 mil (35 microns) dry film thickness. Higher film thickness, insufficient ventilation, high humidity or cooler temperatures will require longer cure times and could result in solvent entrapment or premature failure. *Dry to topcoat with itself or other alkyds.
- Recoat intervals may vary from those listed above when using under intumescent fireproofing products. Consult Carboline Technical Service for recommended cure times before applying Carboline intumescent products.
Surface Preparation
General
- Surfaces must be clean and dry. Employ adequate methods to remove dirt, dust, oil and all other contaminants that could interfere with adhesion of the coating.
Steel
- SSPC-SP6 with a 1.0-2.0 mil (25-50 microns) surface profile for maximum protection. SSPC-SP2 or SP3 as minimum requirement.
- When using under fireproofing products, defer to the primer surface preparation requirements in the product data sheet of the fireproofing product
Application Methods
Product Information | |||||
---|---|---|---|---|---|
Conventional Spray: | Pressure pot equipped with dual regulators, 3/8” I.D. minimum material hose, 0.052” I.D. fluid tip and appropriate air cap | ||||
Airless Spray: | Pump Ratio: 30:1 (minimum) | ||||
GPM Output: 3.0 (minimum) | |||||
Material Hose: 3/8” I.D. (minimum) | |||||
Tip Size: 0.013-0.017” | |||||
Output PSI: 1800-2000 | |||||
Filter Size: 60 mesh | |||||
Brush & Roller (General): | For small areas and touch-up only. Avoid excessive re-brushing or re-rolling | ||||
Brush: | Use a synthetic bristle brush. | ||||
Roller: | Use a short-nap natural roller cover with solvent resistant core. |
Application Conditions
Product Application Conditions | |||||
---|---|---|---|---|---|
Condition | Material | Surface | Ambient | Humidity | |
Minimum | 35°F (2°C) | 35°F (2°C) | 35°F (2°C) | 0% | |
Maximum | 120°F (49°C) | 120°F (49°C) | 120°F (49°C) | 95% |
- This product simply requires the substrate temperature to be above the dew point.
- Condensation due to substrate temperatures below the dew point can cause flash rusting on prepared steel and interfere with proper adhesion to the substrate.
- Special application techniques may be required above or below normal application conditions.
Health & Safety
- Refer to the safety data sheet in the attachments section above and tin label prior to use.
Data sheet
- Manufacturer
- Nullifire
- Water / Solvent Based
- Solvent
- For Use On
- Steel
- Application Method
- Conventional Spray, Airless Spray, brush, roller
- Colour
- Standard / Ready Mixed
- Single, Two or Three Pack
- Single
- Pack Size
- 5L
- UN Number
- UN1263
- Base Type
- Alkyd
- Suitable For Use On
- Structural Steel
- Application Method
- Brush
- Application Method
- Roller
- Application Method
- Spray
- Product Usage Type
- Primer
- Colour Family
- Red
Questions
Question about the product
Be the first to ask a question about this product!
IMPORTANT SHIPPING & DELIVERY INFORMATION
Nullifire PM020 Alkyd High-Build Primer is only available with the shipping and delivery timescales listed below - please do not contact our Customer Support Team with enquiries about alternative or earlier shipping and delivery times.
Saturdays and Sundays, as well as Bank Holidays, are not classed as working days.
Orders placed after the cut-off for this product will not be processed for earliest dispatch until 9am the next working day.
All delivery costs below are excluding VAT
Carboline Thinner 2
Carboline Thinner 2 is a thinner for use in industrial coatings.
Surface Preparation Kits for Steel
These surface preparation kits for steel have been created to help provide customers with an easily accessible bundle of tools to aid in the preparation of steel surfaces in accordance with ISO 8501-1 (St2/3) and SSPC (SP 2/3). Please click here for important information about these kits. Kit Contents: SET 1 (Hand Tools) 1 x Rust-Oleum...