- There are no more items in your cart
- Shipping Calculated at checkout
-
Sub-Total (inc. VAT)
£0.00
A heavy-duty polyurethane cement screed designed to create uniform non-slip finishes whilst providing excellent thermal shock resistance for a variety of industrial environments. FasTop Multi DP is laid between 5-7mm and then broadcast with Quartz, Granite or Carborundum aggregate to give a heavy non-slip finish designed to provide low slip potential in areas that are wet and/or exposed to greases and oils. The system is overcoated with FasTop Multi T150 to seal the silica sand in and provide a hard wearing and long-lasting surface. The system is designed to work with the current modular FasTop resins and hardeners to give maximum flexibility to customers.
- Excellent slip resistance
- High chemical resistance
- Resistant to hot water
- Extremely hard wearing
- Campden BRI approved as non-tainting
Professional use only - from the 24th August 2023, adequate training is required before industrial or professional use of this product.
Should you require training, visit - https://www.safeusediisocyanates.eu/
Product customisation
Don't forget to save your customization to be able to add to cartProfessional use only - from the 24th August 2023, adequate training is required before industrial or professional use of this product.
Should you require training, visit - https://www.safeusediisocyanates.eu/
Quick Links - Click To Jump To Section:
Recommended Uses
- Food manufacture and processing
- Brewing and beverage
- Pharmaceutical and chemical plant processing
- Heavy duty plant and traffic areas
- Dairies
- Commercial kitchens
- Abattoirs and meat processing
Surface Preparation
New Concrete Floors: New concrete must be clean, sound, dry, fully cured and surface laitance removed by vacuum enclosed shot blasting or mechanical grinding, a minimum strength of 25N/mm² is required.
Existing Concrete Floors: Remove all dirt, oil, grease, old paint or any other surface contaminants by vacuum enclosed shot blasting, scarifying or mechanical grinding. Fats, oils or greases must be removed by mechanical means and detergent washing and making sure all residue of detergent is washed and removed by rinsing with clean water. Local repairs should be carried out using FasTop Multi BU.
Existing Floors (previously coated): All previous coatings and loose floor paints must be removed by mechanical preparation as described in the above section and primed as specified. If the old resin flooring cannot be removed then please consult with our technical team for advice on intercoat adhesion and suitability, as it may not be compatible with the existing floor coating.
Anchor Joints: To ensure the maximum bond is achieved, grooves must be cut into the perimeter of the subfloor, typically 20mm deep by 5-10mm wide. These should be inset approximately 150mm from and running parallel with the walls and adjacent to any doorways, plinths etc. including any finished edge, i.e. both sides of a day work joint. The groove must have a neat square edge and the FasTop Multi DP laid to the full depth forming a perimeter anchorage.
Primer
Primers are optional for this product dependant on substrate surface conditions and porosity. If required FasTop Multi Primer should be used which utilises the FasTop Multi components as detailed on the FasTop Multi Systems brochure and the FasTop Multi Primer product data sheet.
Apply FasTop Multi Primer by medium nap roller, brush or squeegee. Work the primer well into the surface ensuring it is fully wetted out and then roll to complete an even coating without any ponding. Two coats may be required to eliminate any dry patches and to create an even sealed surface. The primer should be worked into and around the anchor joints whilst avoiding to filling these with resin.
For further information please refer to recommended individual product data sheets.
Mixing
Add the FasTop Multi Part A component (base) and then add the contents of the FasTop Multi Part D (color package) in a mixing bucket or directly in a rotary drum mixer, mix thoroughly for a minute then add the FasTop Multi Part B (hardener) component and mix for 1 minute. Add component DP Part C (aggregate) constantly, into the mixing bucket or into the mixer with rotating blades until a homogeneous mixture of the components is obtained.
FasTop Multi DP should be applied immediately after mixing to prepared areas.
Application
FasTop Multi DP may be applied to substrates with a surface temperature in the range of 5-20°C and a relative humidity of 40% to 90% RH, with a minimum air temperature of 8°C and no condensation. Do not pre-warm this product as working times will be substantially reduced if materials are warm.
When the primed surface is tack free FasTop Multi DP should be applied at the required rate as soon after mixing as possible. (Delay can result in variation in surface finish, colour and add to application problems). NB: Cure times are extended at low temperatures.
The FasTop Multi DP mixed compound should immediately be poured evenly over the appropriate area to be covered (monitoring rate of coverage to ensure correct depth of screed). Low floor temperatures and reduced thickness may reduce the flow properties of these products. Work out the mix rapidly and evenly over the area with a notched trowel, pin rake or similar to the appropriate thickness.
Once laid the surface should be broadcast with selected aggregates (Quartz, Granite or Carborundum) to obliteration by hand or mechanical blower at a rate of 2 kg/m2 to saturation using one of the following three aggregate options. :-
- FasTop DP Light Duty 0.7-1.2mm Aggregate scattered evenly
- FasTop DP Medium Duty 1.2-1.8mm Aggregate scattered evenly
- FasTop DP Heavy Duty 1-3mm Aggregate scattered evenly
Continue broadcasting to excess until the floor appears dry and even and then allow to cure for 12-24 hours. Once cured any remaining loose aggregate should be removed, and the surface sealed by the application of FasTop Multi T150 by squeegee, roller or brush at the following coverage rates in line with the aggregate used as the scatter.
- FasTop DP Light Duty 0.7-1.2mm Aggregate = 0.4 - 0.6 kg/m2
- FasTop DP Medium Duty 1.2-1.8mm Aggregate = 0.7 - 0.9 kg/m2
- FasTop DP Heavy Duty 1-3mm Aggregate = 1.0 - 1.2 kg/m2
See Sherwin-Williams FasTop DP System Guide for recommended floor systems.
Data sheet
- Manufacturer
- RSL
- For Use By
- Industrial Use
- Interior / Exterior Use
- Interior Use
- For Use On
- Concrete Floors
- Application Method
- Trowel
Rake - Sheen
- Matt
- Colour
- Standard / Ready Mixed
- Single, Two or Three Pack
- Three-Pack
- Pack Size
- 22.10KG
- Application
- Trowel
Rake - Dry to Recoat (at 20°C)
- 12-16 hours
- Coverage
- 22.1 kg will cover 2.20 m2 @ 5 mm
1.83 m2 @ 6 mm
5 mm – 10 kg/sqm
7 mm – 14 kg/sqm - Max. Application Temperature
- 20°C
- Min. Application Temperature
- 5°C
- Solids by Volume
- ~100%
- Layer Thickness
- 5-7 mm
- Dry for Light Traffic (at 20°C)
- 12-16 hours
- Dry for Full Traffic (at 20°C)
- 48 hours
- Pot Life
- 15 minutes from mixing
- Suitable For Use On
- Chemical Processing Plants
- Suitable For Use On
- Concrete
- Suitable For Use On
- Dairies
- Suitable For Use On
- Concrete Floors
- Suitable For Use On
- Commercial Kitchens
- Suitable For Use On
- Factory Floors
- Suitable For Use On
- Kitchen Floors
- Suitable For Use On
- Oily Floors
- Suitable For Use On
- Meat Processing Plants
- Suitable For Use On
- Breweries
- Suitable For Use On
- Anchor Joints
- Suitable For Use On
- Beverage Industry
- Suitable For Use On
- Food Processing Plants
- Suitable For Use On
- New Concrete Floors
- Suitable For Use On
- Existing Concrete Floors
- Suitable For Use On
- Concrete Factory Floors
- Suitable For Use On
- New Concrete
- Suitable For Use On
- Food Manufacturing
- Suitable For Use On
- Wet Floors
- Suitable For Use On
- Concrete Brewery Floors
- Suitable For Use On
- Pharmaceutical Processing Plants
- Finish
- Matt
- Application Method
- Trowel
- Application Method
- Rake
- Components
- 3K
- Product Usage Type
- Coloured Screed
- Product Range
- FasTop Multi
- Full Chemical Resistance
- 5-7 days
- Colour Family
- Green
- Colour Family
- Red
- Colour Family
- Orange
- Colour Family
- Black
- Colour Family
- Magnolia
- Colour Family
- Gold
- Colour Family
- Cream
- Colour Family
- Beige
- Colour Family
- Grey
- Average Application Thickness
- 5-7mm
- Product Type
- Polyurethane Cement
Questions
Question about the product
Be the first to ask a question about this product!
IMPORTANT SHIPPING & DELIVERY INFORMATION
RSL FasTop Multi DP is only available with the shipping and delivery timescales listed below - please do not contact our Customer Support Team with enquiries about alternative or earlier shipping and delivery times.
Saturdays and Sundays, as well as Bank Holidays, are not classed as working days.
Orders placed after the cut-off for this product will not be processed for earliest dispatch until 9am the next working day.
All delivery costs below are excluding VAT
RSL Resuflor WB - Standard Readily Available Colours
A multi-purpose, two-pack, water-based epoxy coating in 13 colours primarily for concrete walls and floors. It can also be applied to concrete poured 7 days prior, as well as wood for a dust-free finish. These standard colours are readily available with faster shipping options; more colours are also available separately that are made to...
RSL FasTop Multi T150
3-pack polyurethane coating, that acts as the top coat when refinishing is necessary. When used with other Resuthane screeds, it ensures uniformity in concrete areas. Brush, roller or squeegee application High chemical resistance Resistance to hot water & steam Excellent slip resistant finish Matt finish Very hard wearing Formerly...
RSL Resuprime ST Bonding & Priming Coat
2-pack, solvent-free epoxy resin bonding and priming coat. It bonds resin-based screeds and toppings to cementitious and other surfaces. Versatile for many types of application. Excellent adhesive properties. Easy to apply. Can be used as a tack coat for screeds. No unpleasant or harmful odours. Formerly known as Resuprime.
RSL Resuflor Screed
Resuflor Screed (formerly known as Resuscreed 45) is a heavy duty, epoxy resin floor screed which uses a crystalline silica free aggregate, making it more environmentally friendly. Must seal for an impervious finish. Less dust than other screeds Low odour Hard wearing Abrasion and impact resistant Can form coving and falls Can be...
RSL Resuprime MVT
A faster curing version of R.S. Dampshield, with overcoat times of 6 hours. A two-component epoxy resin primer, it enables even earlier access onto new or existing concrete substrates for screed and coating applications on carpets, tiles, vinyl and wood. Easy application Use on substrates with hygrometer readings <97% Solvent-free...
RSL Resuflor Patch
RSL Resuflor Patch (Formerly known as Resuscreed PA and Resupatch) is a three-pack epoxy resin mortar designed for rapid concrete repair in heavy duty environments. Excellent mechanical properties Can be feather edged Abrasion and impact resistant Dust-free Concrete like in appearance Easy to apply Minimum surface preparation...