- There are no more items in your cart
- Shipping Calculated at checkout
-
Sub-Total (inc. VAT)
£0.00
- One-component, solvent-free, silylated polymer-based adhesive.
- For professional use.
- Low VOC emissions.
- For installing multi-layer, pre-finished wood flooring and medium size planks of wood.
- Also suitable for heated substrates.
Quick Links - Click To Jump To Section:
Features & Benefits
- Ultrabond Eco S948 1K is a one-component, silylated polymer-based adhesive without water, solvents (according to TRGS 610), amines and epoxy resin, with very low emission level of volatile organic compounds (EMICODE EC1 Plus)
- One-component, ready-to-use product; no catalyst is required, therefore no mixing. If stored correctly, remaining quantities of the product may be used again at a later date
- GEV certified, as a product with very low emission level of volatile organic compounds (EMICODE EC1 Plus) and Blauer Engel
- No hazard or warning signs or messages
- Easy to apply with excellent ridge holding
- 20-30% more yield compared with conventional two-component adhesives, thanks to its low viscosity and
free-flowing properties when applied by trowel - Totally free of solvents (according to TRGS 610)
- Easy to remove from hands and pre-finished elements
- Compatible with Ultracoat Oil and with the water-based lacquers and undercoats of Ultracoat line
Recommendations
- Before installing, make sure the rooms have suitable windows and fittings
- The humidity level in the screed must be compliant with that prescribed by the current standards for the installation of wood, and as indicated in the technical data sheet for the parquet flooring
- If the substrate is not thoroughly dried, or if the residual humidity is higher than the level prescribed, we recommend the use of a suitable waterproofing primer, such as Eco Prim PU 1K, Primer MF, Primer MF EC Plus
- If there is a risk of rising damp, a vapour barrier must be installed before laying the screed
- Do not use Ultrabond Eco S948 1K if the temperature is lower than +10°C or higher than +35°C
- When transported over long distances, thermally insulated containers may be required
Application
Preparation of the substrate:
- The substrate must be checked carefully to assess its condition, and to prepare it for laying parquet flooring
Cementitious screeds:
- Must be well cured, dry, flat and mechanically strong
- The surface must be free of dust, loose parts, oil, paint, etc
- The level of humidity in the screed must be measured using a carbide hygrometer
- To solve problems of residual humidity levels higher than those prescribed for laying, wait until the screed is dry, or apply a suitable waterproofing primer, such as Eco Prim PU 1K, Eco Prim PU 1K Turbo, Primer MF, Primer MF EC Plus, Triblock P, etc
- Cracks in the substrate must be repaired beforehand with a product such as Eporip, Eporip Turbo, Epojet, etc
- For installation on surfaces with traces of glue or old existing smoothing compounds, or for multy-layer wood, chipboard, ceramic or natural stone, substrates use Eco Prim T Plus, Eco Prim VG
- Excessively rough or uneven surfaces should be levelled using a smoothing compound with high mechanical properties, such as Fiberplan, Ultraplan, Ultraplan Maxi, Nivorapid, etc., chosen according to the thickness to be installed
- Installation may be carried out once it has cured
- To install rapid-drying, controlled-shrinkage screeds, use a special Mapei hydraulic binder: Mapecem, which allows for installation after 24 hours, or Topcem for installation after 4 days
- Topcem Pronto or Mapecem Pronto pre-blended, ready-to-use mortar may be used as an alternative, and wood may be laid after 4 days and 24 hours, respectively
- In the presence of light-weight or insulation layers, in case of screeds installed directly on the ground, a vapour barrier must be installed to avoid rising damp
Old ceramic, marble, etc. floors:
- Must be carefully cleaned and degreased before bonding
- The adhesive may only be applied once the surface is dry
Wooden floors:
- Make sure wooden floorboards are well bonded to the substrate
- Remove old paint or wax with sandpaper down to the bear wood, and remove all dust using a vacuum cleaner
- The adhesive may then be applied
Anhydrite substrates:
- Check and follow the instructions of the manufacturer of the screed
- Always check if the screed should be sanded and primed
- Mapei recommends sanding and priming with Eco Prim PU 1K, Eco Prim PU 1K Turbo, Primer MF and Primer MF EC Plus
Spreading the adhesive:
- Spread the adhesive on the substrate using a Mapei notched trowel for wood
- Wood has to be laid within approximately 35 minutes under normal temperature conditions (at +23°C and 50% R.H.)
- If left-over adhesive from previous applications is to be used, open the drum, remove the skin formed on the surface of the adhesive and proceed as above
- The skin on the surface helps to preserve the left-over adhesive
Laying parquet:
- The parquet to be laid must be stored in a well-protected, dry area in the original packaging supplied by the manufacturer, it must not be subjected to condensation and must not be stored directly on the ground
- The level of humidity in the wood must comply with the levels indicated by the manufacturer on the technical data sheet
- When laying, press down firmly to make sure the adhesive is well applied to all the wood
- The special rheological properties of Ultrabond Eco S948 1K makes final adjustment easy
- Leave a joint approximately 1cm wide around the perimeter of the floor and around columns and other protruding points
- Make sure that adhesive does not seep through the joints to avoid dirtying the surface
Polishing:
- The floor may be polished after 3 days.
Cleaning:
- Ultrabond Eco S948 1K may be removed from floors and tools using specialist cleaning solutions while still fresh
- Once hardened, it must be removed mechanically or with specialist cleaner
Storage and Safety Instructions
- 12 months in its original, well-sealed container stored under normal conditions
- Instructions for the safe use of our products can be found on the latest version of the Safety Data Sheet (see 'Data Sheets' section above)
- Keep out of the reach of children
- Ensure good ventilation during and after use and drying
- Do not eat, drink or smoke when using this product
- In case of contact with skin or eyes, rinse immediately with plenty of water
- Do not allow product to reach sewage system, water course or soil
- Give only empty containers to recycling
- Dried product residues may be disposed of as domestic waste if allowed by local regulations
- Product preservative-free
- Methanol separates during hardening
- Ensure constant ventilation when using this product
- Ensure proper ventilation for several days after laying the flooring
- Wear protective gloves
- The product contains: mineral fillers, binders, additives, drying agent, catalyst, stabilizer, pigments (Vdl-RL 01/May 2019)
- Blauer Engel: DE-UZ 113
Data sheet
- Manufacturer
- Mapei
- For Use By
- Professional Use
- For Use On
- Cementitious Screeds
Wooden Floors
Ceramics
Marble
Terrazzo
Anhydrite Substrates
Underfloor Heating - Application Method
- Trowel
- Single, Two or Three Pack
- Single
- Pack Size
- 15kg
- Max. Application Temperature
- 35°C
- Min. Application Temperature
- 10°C
- Density
- 1.65 ± 0.05 g/cm³
- Solids by Volume
- 98%
- Consumption
- 800 - 1200g/m²
- Open time
- 40 mins
- Suitable For Use On
- Wooden Floors
- Suitable For Use On
- Marble
- Suitable For Use On
- Terrazzo
- Suitable For Use On
- Ceramics
- Suitable For Use On
- Underfloor Heating
- Suitable For Use On
- Cementitious Screeds
- Suitable For Use On
- Anhydrite Substrates
- Application Method
- Trowel
- Manufacturer
- Mapei
- Product Usage Type
- Adhesive
- Product Range
- Ultrabond
- Foot Traffic
- 12 hours
- Viscosity Brookfield (cP)
- 35,000 ± 5,000 mPa·s (rotor 7 - 50 RPM)
Questions
Question about the product
Robert on 2024-10-14 23:39:52 | Question:
Mapei Ultrabond Eco S948 1K it states use a Mapei Notched trail for wooden floors however, I can’t find one for sale anywhere?! what size trail is required for this product? Thank you |
Answer from Rawlins’ Technical Team:
Thank you for your enquiry, we have contacted the manufacturer for a quote and replied direct to you with this information via e-mail. | |
IMPORTANT SHIPPING & DELIVERY INFORMATION
Mapei Ultrabond Eco S948 1K is only available with the shipping and delivery timescales listed below - please do not contact our Customer Support Team with enquiries about alternative or earlier shipping and delivery times.
Saturdays and Sundays, as well as Bank Holidays, are not classed as working days.
Orders placed after the cut-off for this product will not be processed for earliest dispatch until 9am the next working day.
All delivery costs below are excluding VAT