Follow us on:

Visqueen EcoMembrane DPM | BBA Certified
Visqueen EcoMembrane DPM | BBA Certified
Visqueen EcoMembrane DPM | BBA Certified

Visqueen EcoMembrane DPM

VIS11395

For use in ground floor constructions, positioned above or below the structural floor, to protect buildings against moisture from the ground. Not intended for use where there is a risk of hydrostatic pressure or accredited for radon applications.

  • Suitability for use of 0.25mm (1000 gauge) Visqueen EcoMembrane DPM should be confirmed and approved by all stakeholders prior to use
  • BBA certified - third party accreditation
  • Manufactured using a minimum 90% recycled polyethylene - diverts waste from landfill
  • Versatile - range of available thicknesses
Colour
Size
£44.26(incl. VAT)
£36.88(ex. VAT)
Quantity
Please choose your colour
Available for Delivery (See Delivery Options Below)

No queries yet, leave the first!
Description



Quick Links - Click To Jump To Section:




Approvals and Standards


  • Third party accreditation (BBA 94/3009)
  • CE Mark EN 13967:2017
  • Quality Management System ISO 9001:2015
  • Occupational Health and Safety System ISO 45001:2018
  • Environmental Management System ISO 14001:2015



System Components




Storage and Handling


Visqueen EcoMembrane DPM should be stored horizontally, under cover in its original packaging.

Care should be taken when handling the product in line with current manual handling regulations.



Preparation


Visqueen EcoMembrane DPM should be installed on a smooth continuous surface e.g. grouted beam and block floor, a compacted blinding layer e.g. 50mm thick sand blinding, or smooth concrete blinding. The substrate should be free from irregularities such as voids or protrusions.

The membrane can be cut with a sharp retractable safety knife or robust scissors.



Installation


Visqueen EcoMembrane DPM should be loose laid on the substrate. The membrane should be clean and dry at the time of jointing. It should be overlapped by a minimum of 150mm, bonded with Visqueen Pro Double Sided Jointing Tape and sealed with Visqueen Pro Single Sided Tape.

Damp proofing seals should be formed around all service entry points. Visqueen Preformed Top Hat Units are available for sealing service entry pipe junctions. The base of the top hat and the upstand should be bonded using Visqueen Pro Double Sided Jointing Tape and sealed with Visqueen Pro Single Sided Tape. The upstand should be secured with the supplied jubilee clip. Alternatively Visqueen Pro Detailing Strip can be used to seal service entry pipe detailing.

Forming an effective barrier to damp with the membrane may give rise to complex three-dimensional detailing. To simplify complex or awkward junctions e.g. internal and external corners Visqueen Preformed units are available. Alternatively Visqueen Pro Detailing Strip can be used to seal awkward junctions.

If the membrane is punctured or perforated a patch of the same material should be lapped at least 150mm beyond the limits of the puncture and bonded with Visqueen Pro Double Sided Jointing Tape and sealed with Visqueen Pro Single Sided Tape. Alternatively a patch can be formed using Visqueen Pro Detailing Strip and lapped at least 150mm beyond the extents of the puncture.

The membrane should be covered immediately after installation to prevent damage from following trades, ultraviolet light, etc. Care should be taken to ensure that the membrane is not punctured, stretched or displaced when applying the final floor covering.

When reinforced concrete is to be laid over the membrane the wire reinforcements and spacers must be prevented from puncturing the membrane. Where there is a potential risk of damage, the membrane should be covered with Visqueen TreadGuard protection, screed, or other approved protection material before positioning the reinforcement.

In areas where high levels of settlement are anticipated, Visqueen Pre Applied Membrane should be considered.



Usable Temperature Range


It is recommended that Visqueen EcoMembrane DPM and all associated system components should not be installed below 5°C.



Additional Information


To assist build sequencing, Visqueen Zedex CPT High Performance DPC is available for damp protection through masonry wall constructions.

Please note EcoMembrane DPM is NOT accredited for radon applications. Please use either Visqueen Ultimate RadonBlok600 or Visqueen Radon R400 Membrane.

The product is recyclable and categorised under LDPE recycling code 4.



Product Details
11395-1007627

Data sheet

For Use By
Consumer Use
Interior / Exterior Use
Interior Use
For Use On
Smooth Continuous Surface
Grouted Beam And Block Floor
Compacted Blinding Layer
50Mm Thick Sand Blinding
Smooth Concrete Blinding
Min. Application Temperature
5°C
Suitable For Use On
Smooth Continuous Surface
Suitable For Use On
Grouted Beam And Block Floor
Suitable For Use On
Compacted Blinding Layer
Suitable For Use On
50mm Thick Sand Blinding
Suitable For Use On
Smooth Concrete Blinding
Usages
Damp Proofing System
Product Usage Type
Damp Proof Membrane
Colour Family
Black
Industry Approved System
BBA
Attachments
Download


Customer agrees that before placing an Order, Customer has read and understood the most up to date Product Data Sheet for the Product. Where we have access to the Product Data Sheet from the manufacturer, we will either provide a copy on request, or include a link to the Product Data Sheet available on the manufacturer’s website. Customer further agrees that we have no liability for any errors or omissions contained within the Product Data Sheets. For more information, please see our Terms & Conditions of Sale.

Questions

Question about the product

* Required fields
(read)

Be the first to ask a question about this product!

IMPORTANT SHIPPING & DELIVERY INFORMATION

Visqueen EcoMembrane DPM is only available with the shipping and delivery timescales listed below - please do not contact our Customer Support Team with enquiries about alternative or earlier shipping and delivery times.

Saturdays and Sundays, as well as Bank Holidays, are not classed as working days.

Orders placed after the cut-off for this product will not be processed for earliest dispatch until 9am the next working day.

All delivery costs below are excluding VAT