Ardex A29 is a hardening cement used to produce bonded, unbonded and floating screeds in internal or external locations. A 1:7 mix is suitable for most normal screeding situations - an Ardex A 29 Screed passes the BRE Screed (ISCR) after 24 hours (tested on 50mm unbonded at 20°C).
- 90 minute working time
- Rapid hardening, walkable after approximately 8 hours
- Passes the BRE Screed (ISCR) Screed Test in as little as 24 hours
- Install ceramic tiles in as little as 24 hours and natural stone after 7 days
- Install resilient and wood floor finishes in as little as 7 days
- Apply as a bonded, unbonded or floating screed
- Can be used with underfloor heating systems
- Can be pumped for fast application
Ardex A 29 is a special cement for producing a rapid hardening floor screed for internal and external use which allows ceramic tiles to be fixed in as little as 24 hours, and natural stone and resilient floor coverings in as little as 7 days.
Quick Links - Click To Jump To Section:
- Thickness
- Pack Contents
- Preparation
- Mixing Proportions
- Mixing
- Application
- Drying Time
- Surface Finish
- Pumping
- Coverage
- Technical Data
Thickness
Ardex A 29 should be applied at the conventional thicknesses for normal cement/sand screeds i.e. Minimum 20mm at 1:5 ratio and minimum 25mm at 1:7 ratio, (design thickness up to 40mm) for bonded screeds. Minimum 50mm for unbonded screeds. Minimum 75mm for floating screeds. 65mm in lightly loaded (domestic) locations.
Pack Contents
Packed in paper sacks incorporating a polyethylene liner – net weight 20kg.
Preparation
Bonded Screed
An Ardex A 29 Screed can be laid as a bonded screed by applying either Ardex A 18 Screed Bonding Cement or an Ardex A 29 grouting slurry to a dry and suitably prepared concrete base.
To prepare the grouting slurry for use in internal dry locations, dilute Ardex P 51 Primer and Bonding Agent with an equal volume of water. Mix the Ardex A 29 cement with an equal volume of screeding sand and then mix with the diluted bonding agent, to produce a grouting slurry of creamy consistency. The Ardex A 29 Screed Mortar must be compacted onto the base ‘fresh in fresh, whilst the grouting slurry is still wet and workable.
For external locations, wet areas and damp concrete, use Ardex A 18 Screed Bonding Cement or prepare the Ardex A 29 grouting slurry as above using Ardex E 100 Additive for Bonding/Slurry Grouts diluted with an equal volume of water.
Note: The concrete surface must be prepared using suitable mechanised equipment to expose the coarse aggregate and be free from all barriers to adhesion.
Unbonded Screed
For unbonded screeds, it is good practice to ensure that the concrete slab surface is reasonably true and flat prior to applying a proprietary damp proof/slip membrane.
Floating Screed
For floating screeds, place a suitable separating layer or damp proof membrane over the insulation before applying the screed mortar.
Note: An Ardex A 29 Screed is suitable for direct application to concrete bases which are insufficiently dry (above 75% RH), direct to ground or ground supported without an effective damp proof membrane, as well as areas which are subject to rising damp. It is however recommended for projects installing resilient floor finishes such as carpet, vinyl, rubber & wood that the use of a damp-proof membrane is incorporated as follows to protect the finish from moisture in the underlying substrate. For unbonded and floating screeds, install a proprietary damp proof/ slip membrane as recommended by BS 8204 1:2003+A1:2009 and BS 5385-3:2014 before laying the screed; for bonded screeds, it is recommended screeding is followed by an application of Ardex DPM 1 C/ Ardex DPM 1 C R, when the screed is walkable after approximately 8 hours. Should the concrete base be affected by residual construction moisture and is below 95%RH, Ardex MVS 95 can be substituted for the Ardex DPM and can be applied when the screed is walkable after approximately 8 hours.
Mixing Proportions
Mix a maximum of 1 part by weight of Ardex A 29 Cement to 7 parts by weight screeding sand.
The sand used should be good quality, well graded 0/8mm sand. BS 8204-1:2003 recommends that screeding sands are classified to BS EN 13139.
Alternatively, a 0/8mm fine aggregate with fines category 1 with range MP should be used.
Experience has shown that sand complying with the following grading table provides a workable screeding mortar with good compactability.
Where the available screeding sand is good quality, but does not have the required coarse fraction, a nominal 6mm aggregate can be mixed with the screeding sand. The ratio of screeding sand to 6mm aggregate will depend upon the actual gradings involved and the workability of the mix, however approximately 10% of 6mm aggregate by mass of aggregate can be used as a starting guide.
Where the screed thickness is consistently greater than 50mm, a fine concrete mix can be used by partially replacing some of the screeding sand with a suitable amount of 8mm or 10mm single sized aggregate. The optimum proportions of cement to sand, or to sand plus aggregate, should be determined within the mix proportions of 1 part Ardex A 29 Cement with 7 parts by weight of sand, or sand plus aggregate, to obtain good workability and achieve the required soundness category. The sand, fine or coarse aggregates used should not contain lime or other materials that could be detrimental to the workability of the screed mortar during application, or the performance of the set and hardened screed. Do not add any other cement or lime materials to Ardex A 29 mixes.
Water
Add sufficient water to obtain a workable mix. With an evenly graded, fairly dry sand, the water requirement will normally be up to a maximum of 11 litres per 20kg bag of Ardex A 29 (including the water contained in the sand/ aggregate).
Mixing
When a sample of mixed mortar is squeezed in the hand the sample should retain its shape and not crumble, the hand being left slightly moist. When a sample is compacted on the base, no film of water should form on the surface.
Mix to a normal screed mortar consistency. If a mixer is used it should be a pan, trough or other forced action type. Normal ‘free-fall’ mixers are not suitable for mixing semi-dry screed mortars. Use clean equipment and do not use other cements, lime or screed additives etc., in the mix.
Application
The working time of the mixed mortar is approximately 90 minutes at 20°C, therefore mixing, placing, compaction and trowelling off must proceed without delay. The amount of mortar mixed and the area to be screeded should be limited so that trowelling off and finishing can be completed within the working time.
Where a new bay is laid against a set and hardened screed it is recommended that such daywork joints are vertical and treated with the grouting slurry and may be tied together with steel reinforcement.
Apply an Ardex A 29 Screed at temperatures of 5°C and rising.
Application on a Floor Heating System
When an Ardex A 29 screed has been laid on a hot water floor system, 7 days should be allowed to elapse before heating the water up to a temperature of 25°C and maintained for a further 3 days. The maximum floor temperature should then be used and maintained for a further 4 days. In doing so draughts must be avoided.
The floor should then be allowed to cool down to room temperature (above 15°C) before laying floorcoverings.
Drying Time
A bonded Ardex A 29 Screed is normally ready to receive ceramic tiles after 24 hours. For unbonded and floating screeds, 7 days drying time is required, or a moisture reading of less than 2% by the Carbide method, before fixing ceramic tiles.
Natural stone tiles can be fixed after 7 days. An Ardex Screed can usually receive resilient and wood floorcoverings after 7 days, or when a moisture reading of less than 2% by the Carbide method is recorded.
The time taken to harden, and the drying time of the Ardex A 29 Screed, is determined by screed thickness and ambient conditions on site. Low temperatures will slow down the rate of hardening whilst high temperatures will accelerate hardening, thus reducing the working time.
Note: High or low relative humidity will slow or accelerate the drying time respectively. Drying times apply to 23°C and 50% relative humidity for screeds up to 50mm thick. The use of a Speedy moisture tester is recommended to determine the moisture content prior to applying the appropriate floorcovering.
For ultra rapid drying screeds that dry uniformly, irrespective of thickness, consult the Ardex A 38 or Ardex A 35 data sheets. Where higher early and late strength development is required, a 1:5 mix may be used. Note the maximum mix water content that should be used, including the moisture in the aggregate, is 11 litres per 20kg bag of Ardex A 29.
Note: Screeds are not designed as wearing surfaces and the screed surface should be given adequate protection once dry, against damage water ingress, wear and contamination during subsequent building operations. Protective coverings will also minimise any curling and lipping at joints in unbonded screeds.
Surface Finish
For fixing ceramic tiles and quarry tiles, etc., the screed should be finished with a wood float. Prior to laying thin floorcoverings e.g. vinyl sheet, a very smooth surface may be obtained using and Ardex Levelling and Smoothing Compound, which should be selected with the final floor finish in mind. Please refer to the relevant Ardex Technical Datasheet for further information.
Pumping
It is possible to pump Ardex A 29 screed mixes using a proprietary screed pump. Contact our Technical Team for further details.
Coverage
Approximately 0.27kg Ardex A 29 cement per m² for each millimetre of screed thickness using a 1:7 mix.
Technical Data
Soundness ISCR (BRE Screed Test)
Annex D and E of BS 8204-1:2003 contains advice on the use of this in situ crushing resistance test on bonded, unbonded and floating screeds. The installed Ardex A 29 can normally be tested after 24 hours using the BRE screed tester, if required. The depth of an indentation of a correctly mixed and compacted screed should comply with the requirements of the floor finish and category of use.
Moisture Testing
Should the moisture content need to be determined the Speedy Moisture Tester (Carbide method) must be used. Please consult Rawlins Technical for further advice on 0113 2455450 (option 2) or send a message to [email protected].
Data sheet
- For Use By
- Professional Use
- Interior / Exterior Use
- Interior Use
- For Use On
- Concrete Floors
- Application Method
- Trowel
- Single, Two or Three Pack
- Single
- Coverage
- 1.85kg per m² per millimetre of screed thickness
- Tensile Strength
- At 1:4 mixing ratio: After 1 day: 5 N/mm²
After 3 days: 6 N/mm²
After 28 days: 7 N/mm² - Min. Application Temperature
- 5°C
- Drying time
- Ceramic and natural stone tiles installed after just 24 hours (irrespective of screed thickness)
- Drying time
- Resilient floorcoverings can be installed after 24 hours
- Hard Dry
- 24 hours
- Walk-on Time
- 3 hours
- Compressive Strength
- At 1:4 mixing ratio: After 1 day: 25.0 N/mm²
After 3 days: 32.0 N/mm²
After 28 days: 40.0 N/mm² - Base Type
- Cement
- Suitable For Use On
- Concrete Floors
- Application Method
- Trowel
- Usages
- Underfloor Heating
Questions
Question about the product
Be the first to ask a question about this product!
IMPORTANT SHIPPING & DELIVERY INFORMATION
Ardex A29 Rapid Hardening Cement is only available with the shipping and delivery timescales listed below - please do not contact our Customer Support Team with enquiries about alternative or earlier shipping and delivery times.
Saturdays and Sundays, as well as Bank Holidays, are not classed as working days.
Orders placed after the cut-off for this product will not be processed for earliest dispatch until 9am the next working day.
All delivery costs below are excluding VAT