- There are no more items in your cart
- Shipping Calculated at checkout
-
Sub-Total (inc. VAT)
£0.00
International Intergard 307 is a two pack epoxy zinc phosphate primer, primarily formulated to meet the requirements of the UK Highways Agency specification. International Intergard 307 is intended to be used as a primer or blast primer under high build epoxy coating schemes for new construction.
International Intergard 307 is a two pack epoxy zinc phosphate primer, primarily formulated to meet the requirements of the UK Highways Agency specification. International Intergard 307 is intended to be used as a primer or blast primer under high build epoxy coating schemes for new construction.
International Intergard 307 has the following specification approvals:
- UK Highways Agency Item No. 110
- UK Network Rail Systems N2, M21
International Intergard 307 is intended for use as a thin film epoxy primer, or blast primer, as part of approved UK Highways Agency and Network Rail protective schemes, typically under high build epoxy glass flake coatings.
International Intergard 307 contains a high proportion of zinc phosphate, to comply with the requirements of the Highways Agency but is not suitable as a primer for systems designed for permanent water immersion.
The following topcoats/intermediates are recommended for Intergard 307:
Data sheet
- Manufacturer
- International
- For Use By
- Professional Use
- Water / Solvent Based
- Solvent
- For Use On
- Steel
- Sheen
- Matt
- Colour
- Standard / Ready Mixed
- Single, Two or Three Pack
- Two-Pack
- Pack Size
- 5L
- Mixing Ratio
- 3 part(s) : 1 part(s) by volume
- Coverage
- 17.2m² per litre
- Recommended Thinner/Cleaner
- International GTA220
- Solids by Volume
- 43%
- VOC
- 351 g/kg
- Shelf Life (from date of manufacture)
- 18 months minimum at 25°C
- Touch Dry
- 30 mins
- Touch Dry
- 5°C: 90 minutes, 10°C: 60 minutes, 20°C: 30 minutes, 30°C: 15 minutes
- Recommended Dry Film Thickness
- 25-40 microns
- Recommended Wet Film Thickness
- 58-93 microns
- UN Number
- UN1263
- Pot Life
- 5°C: 8 hours, 10°C: 8 hours, 20°C: 8 hours, 30°C: 6 hours
- Hard Dry
- 5°C: 5 hours, 10°C: 4 hours, 20°C: 2 hours, 30°C: 1 hour
- Base Type
- Solvent-Based
- Base Type
- Epoxy
- Suitable For Use On
- Steel
- Finish
- Matt
- Usages
- Zinc Phosphate
- Usages
- Atmospheric
- Product Usage Type
- Primer
- Product Range
- Intergard
- Colour Family
- Bamboo
- Dry to Recoat (@ 20-25°C)
- 16 hours
Questions
Question about the product
Be the first to ask a question about this product!
IMPORTANT SHIPPING & DELIVERY INFORMATION
International Intergard 307 is only available with the shipping and delivery timescales listed below - please do not contact our Customer Support Team with enquiries about alternative or earlier shipping and delivery times.
Saturdays and Sundays, as well as Bank Holidays, are not classed as working days.
Orders placed after the cut-off for this product will not be processed for earliest dispatch until 9am the next working day.
All delivery costs below are excluding VAT