- There are no more items in your cart
- Shipping Calculated at checkout
-
Sub-Total (inc. VAT)
£0.00
PPG PhenGuard 940 is a two-component, high-build, amine adduct-cured novolac phenolic epoxy finish; the final coat in the Phenguard tank coating system, with excellent resistance to a wide range of acids, alcohols, edible oils, solvents and fats (regardless of free fatty acid content).
- Final coat in the PHENGUARD tank coating system: PHENGUARD 930 (1st coat, primer) - PHENGUARD 935 (2nd coat) - PHENGUARD 940 (this coat, 3rd and final coat)
- Maximum cargo flexibility
- Low cargo absorption
- Good resistance to hot water
- Recognized corrosion control coating (Lloyd`s register)
- Good application properties, resulting in a smooth surface that is easy to clean
- 4 hour pot life [at 20°C (68°F)]
PPG PhenGuard 940 is a two-component, high-build, amine adduct-cured novolac phenolic epoxy finish; the final coat in the Phenguard tank coating system, with excellent resistance to a wide range of acids, alcohols, edible oils, solvents and fats (regardless of free fatty acid content).
PhenGuard 940 has good application properties, resulting in a smooth surface that is easy to clean, and is a recognised corrosion control coating (Lloyd's register).
Top Features & Benefits
- 2-component, high-build, amine adduct-cured novolac phenolic epoxy finish
- Final coat in the PHENGUARD tank coating system:
- PHENGUARD 930 (1st coat, primer)
- PHENGUARD 935 (2nd coat)
- PHENGUARD 940 (this coat, 3rd and final coat)
- Excellent resistance to a wide range of:
- Organic acids
- Alcohols
- Edible oils
- Fats (regardless of free fatty acid content)
- Solvents
- Maximum cargo flexibility
- Low cargo absorption
- Good resistance to hot water
- Recognized corrosion control coating (Lloyd's register)
- Good application properties, resulting in a smooth surface that is easy to clean
- 4 hour pot life [at 20°C (68°F)]
Refer to tables below for information regarding spreading rate and film thickness, overcoating intervals and curing times
Product Data
Basic data at 20°C (68°F)
Data for Mixed Product | |
---|---|
Mass density | 1.7 kg/l (14.2 lb/US gal) |
Volume solids | 66 ± 2% |
VOC (Supplied) | Directive 1999/13/EC, SED: max. 191.0 g/kg |
max. 315.0 g/l (approx. 2.6 lb/US gal) | |
Recommended dry film thickness | 100 µm (4.0 mils) |
Theoretical spreading rate | 6.6 m²/l for 100 µm (265 ft²/US gal for 4.0 mils) |
Overcoating Interval | Minimum: 24 hours |
Maximum: 21 days | |
Dry to touch | 2 hours |
Full Cure | See Cure table further below |
Notes:
- Refer to tables below for information regarding spreading rate and film thickness, overcoating intervals and curing times
Preparation & Application
Recommended Substrate Conditions & Temperatures
Substrate conditions
- Previous coat (PHENGUARD 935) must be dry and free from any contamination
- The substrate must be perfectly dry before and during application of PHENGUARD 940
Substrate Temperature & Application Conditions
- Substrate temperature during application and curing should be above 10°C (50°F)
- Substrate temperature during application and curing should be at least 3°C (5°F) above dew point
System Specification
- PHENGUARD 930 (offwhite): 100µm (4.0 mils)
- PHENGUARD 935 (pink): 100µm (4.0 mils)
- PHENGUARD 940 (gray): 100µm (4.0 mils)
Instructions For Use
Mixing ratio by volume: base to hardener 88:12
- TThe temperature of the mixed base and hardener should preferably be above 15°C (59°F), otherwise extra thinner may be required to obtain application viscosity
- Adding too much thinner results in reduced sag resistance and slower cure
- Thinner should be added after mixing the components
Induction time
Allow induction time before use
Mixed product induction time | |
---|---|
Mixed product temperature | Induction time |
15°C (59°F) | 20 minutes |
20°C (68°F) | 15 minutes |
25°C (77°F) | 10 minutes |
Application
Air spray
Recommended Thinner
Volume of thinner
- 0 - 10%, depending on required thickness and application conditions
Nozzle orifice
- 2.0 mm (approx. 0.079 in)
Nozzle pressure
- 0.3 MPa (approx. 3 Bar; 44 p.s.i.)
Airless spray
Recommended Thinner
Volume of thinner
- 0 - 10%, depending on required thickness and application conditions
Nozzle orifice
- Approx. 0.46 – 0.53 mm (0.018 – 0.021 in)
Nozzle pressure
- 15.0 MPa (approx. 150 bar; 2176 p.s.i.)
Brush
Recommended Thinner
Volume of thinner
- 0 – 5%
Cleaning solvent
Additional Data
Note: Maximum DFT when brushing: 60 µm (2.4 mils)
Spreading rate and film thickness | |
---|---|
DFT | Theoretical spreading rate |
100 µm (4.0 mils) | 6.6 m²/l (265 ft²/US gal) |
125 µm (5.0 mils) | 5.3 m²/l (212 ft²/US gal) |
Overcoating interval for DFT up to 100 µm (4.0 mils) | ||||||
---|---|---|---|---|---|---|
Overcoating with... | Interval | 10°C (50°F) | 15°C (59°F) | 20°C (68°F) | 30°C (86°F) | 40°C (104°F) |
itself | Minimum | 36 hours | 32 hours | 24 hours | 16 hours | 12 hours |
Maximum | 28 days | 25 days | 21 days | 14 days | 7 days |
Notes:
- Surface should be dry and free from any contamination
Curing time for DFT up to 100 µm (4.0 mils) | |
---|---|
Substrate temperature | Minimum curing time before transport of cargoes without note 4, 7, 8 or 11 and ballast water or tank test with sea water |
10°C (50°F) | 14 days |
15°C (59°F) | 14 days |
20°C (68°F) | 10 days |
30°C (86°F) | 7 days |
40°C (104°F) | 5 days |
Notes:
- Minimum curing time of PHENGUARD tank coating system before transport of cargoes with note 4, 7, 8 or 11: 3 months
- For detailed information on resistance and resistance notes, please refer to the latest issue of the cargo resistance list
- For transport of methanol and vinyl acetate monomer, a hot cure is required, which cannot be substituted by a service period of 3months with non-aggressive cargoes
- Adequate ventilation must be maintained during application and curing (please refer to INFORMATION SHEETS 1433 and 1434)
- The performance of the applied system strongly depends on the curing degree of the first coat at time of recoating. Therefore overcoating time between 1st and 2nd coat is extended in comparison between 2nd and 3rd coat (see overcoating details)
Pot life (at application viscosity) | |
---|---|
Mixed product temperature | Pot life |
10°C (50°F) | 6 hours |
20°C (68°F) | 4 hours |
30°C (86°F) | 1.5 hours |
Safety Precautions
This is a solvent-borne paint and care should be taken to avoid inhalation of spray mist or vapor, as well as contact between the wet paint and exposed skin or eyes
Data sheet
- Manufacturer
- PPG
- For Use On
- Metal
- Application Method
- Brush, Metal
- Sheen
- Eggshell
- Colour
- Standard / Ready Mixed
- Single, Two or Three Pack
- Two-Pack
- Pack Size
- 4L, 20L
- Parts
- Two
- Base Type
- -
- Solvent
- -
- Mixing Ratio
- 88:12
- Suitable Substrates
- Steel
- Key Features
- Maximum cargo flexibility, Good resistance to hot water, Recognised corrosion control coating (Lloyd's register)
- Application
- Brush, Spray
- Touch Dry (at 20°C)
- 2 hours
- Dry to Handle (at 20°C)
- -
- Dry to Recoat (at 20°C)
- Minimum: 24 hours, Maximum: 21 days
- Fully Cured (at 20°C)
- 10 days
- Pot Life (at 20°C)
- -
- Coverage
- 6.6 m²/l for 100 µm (265 ft²/US gal for 4.0 mils)
- Recommended Thinner/Cleaner
- PPG Thinner 90-53, PPG Thinner 91-92
- Unit Contents
- -
- Compatible Primers
- PPG PhenGuard 930, PPG PhenGuard 935
- Compatible Topcoats
- Itself
- Max. Application Temperature
- -
- Min. Application Temperature
- 10°C (50°F)
- Density
- 1.7 kg/l (14.2 lb/US gal)
- Solids by Volume
- 66 ± 2%
- Heat Resistance (up-to)
- -
- VOC
- Directive 1999/13/EC, SED: max. 191.0 g/kg. max. 315.0 g/l (approx. 2.6 lb/US gal)
- Shelf Life (Once Opened)
- Base: at least 12 months when stored cool and dry, Hardener: at least 12 months when stored cool and dry.
- UN Number (Activator)
- UN3470
- UN Number (Base)
- UN1263
- Suitable For Use On
- Metal
- Finish
- Eggshell
- Application Method
- Brush
- Application Method
- Spray
- Product Usage Type
- Topcoat
- Product Range
- PhenGuard
- Colour Family
- Grey
- For Tanks or Pipes
- Tank
Questions
Question about the product
Be the first to ask a question about this product!
IMPORTANT SHIPPING & DELIVERY INFORMATION
PPG PhenGuard 940 is only available with the shipping and delivery timescales listed below - please do not contact our Customer Support Team with enquiries about alternative or earlier shipping and delivery times.
Saturdays and Sundays, as well as Bank Holidays, are not classed as working days.
Orders placed after the cut-off for this product will not be processed for earliest dispatch until 9am the next working day.
All delivery costs below are excluding VAT
PPG Thinner 90-53
This thinner has been developed by PPG Protective and Marine Coatings for use with selected paint products.
PPG Thinner 91-92
This thinner has been developed by PPG Protective and Marine Coatings for use with selected paint products.
PPG PhenGuard 930
We no longer stock this product, but can recommend PPG PhenGuard 985 as a great alternative. Please note: it is important to check that any alternative product is suitable for your requirements, as our suggestion is given in good faith but without warranty. If you are in any doubt please first contact our technical team on 0113 2455450...
PPG PhenGuard 935
Availability dependant on application; please contact our technical team on 0113 2455450 (option 2) or send a message to [email protected] where we can discuss your project requirements. PPG PhenGuard 935 is a two-component, high-build, amine adduct-cured novolac phenolic epoxy coating, developed as the second coat in the Phenguard...