Sikalastic RoofPro Advanced, a single component high performance waterproof coating system. Cures to form a seamless, durable and weather- resistant waterproofing solution. Part of the Sika Liquid Plastics range.
- For water-proofing of flat and pitched roof structures, communal walkways, podium decks and terrace roofs
- For new construction and refurbishment projects
- Applicable to existing concrete, roofing felt, brickwork, asbestos cement decks (subject to condition and priming requirements)
- 20 year life expectancy
- Economic – provides a cost-efficient life cycle extension of failing roofs
- Cold applied
- Approved to ETAg 005 (Part 6)
- Retains flexibility at low temperatures
- Can be applied all year round above 2°C
Sikalastic RoofPro Advanced is a single component high performance waterproof coating system that cures to form a seamless, durable and weather- resistant waterproofing solution.
Uses include:
Water-proofing of flat and pitched roof structures, communal walkways, podium decks and terrace roofs.
For new construction and refurbishment projects.
Applicable to existing concrete, roofing felt, brickwork, asbestos cement decks (subject to condition and priming requirements).
Quick Links - Click To Jump To Section:
- Features & Benefits
- Tests
- Technical Data
- System Information
- Application Details
- Substrate Preparation
- Substrate Priming
- Application Conditions / Limitations & Instructions
- Curing Details
- Typical Test Data - System
- Notes on Application / Limitations
Features & Benefits
- Single component, ready to use
- 20 year life expectancy
- Cold applied
- Easy and quick application – by spray, brush or roller
- Economic – provides a cost-efficient life cycle extension of failing roofs
- Seamless membrane based upon moisture-triggered chemistry
- Vapour permeable
- Retains flexibility at low temperatures
- Waterproof, develops early rain resistance
- Minimal disruption and low maintenance
- Elastic properties – tolerant of thermal movement
- Flexible, impact resistant membrane
- Can be applied all year round above 2°C
- Approved to ETAg 005 (Part 6)
Tests
- BBA Agrément Certificate - 18/5540
- External fire performance: BRoof (t4) & classification under BS476 Part 3:2004 EXT.F.AC allowing unrestricted use under the current building regulations. For more information please contact Technical Services.
Technical Data
Storage Conditions / Shelf Life | Store in original, unopened and undamaged sealed packaging in dry conditions at temperatures >0°C and < 25°C. Protect from frost. | |
A shelf-life of 6 months is achieved when stored in accordance with the above recommendations at a temperature of 20°C. Exposure to higher temperatures will reduce the shelf-life. | ||
Reference should also be made to the storage recommendations of the material safety datasheet. | ||
Chemical Base | One-component moisture-triggered polyurethane | |
Density | 1.32 kg/L (+20°C) | (EN ISO 2811-1) |
Solid Content | ~ 70.9 % by volume / ~ 78.9 % by weight | (EN ISO 3251) |
Flash Point | ~ 52°C | (EN ISO 3679) |
Service Temperature | -30 to +80°C (intermittent) | |
Chemical Resistance | Resistant to mild acids, alkalis, detergents and some solvents. More details are available on request. Contact Technical Services on 0113 2455450 (option 2) or send a message to [email protected] for specific recommendations. | |
Prohesion testing to ASTM G85-94; Annex A5 (1000 hours cyclic exposure) and cyclic salt fog/UV-A exposure to ASTM D 5894 (6 cycles totalling 1000hours). |
System Information
Minimum Coverage Rates
Flat Roof Waterproofing Only - 25 year expected durability*
Preparation | Prior to priming all substrates must be clean dry and sound free from any oxidisation, mould and any other deleterious materials. For further information please contact Rawlins technical services | |
Embedment Layer* | Sikalastic RoofPro Advanced | 1.0 L/m2 |
Sika Reemat Premium | ||
Top Coat | Sikalastic RoofPro Advanced | 1.0 L/m2 |
*Expected durability is defined within the associated BBA Agrément certificate and is not a guarantee period
Metal and Asbestos Roof Waterproofing Only – 10 year expected durability*
Preparation | Prior to priming all substrates must be clean dry and sound free from any oxidisation, mould and any other deleterious materials. For further information please contact Rawlins technical services | |
Embedment | Sikalastic RoofPro Advanced | 0.5 L/m2 |
Reinforcement | Sika Flexistrip: For protection of bolt-heads prior to reinforcement and coating | |
Sika Flexitape: For reinforcement of sheet laps - bedded in | ||
Sika Reemat Premium: For reinforcement of bolt-heads | ||
First Top Coat: | Sikalastic RoofPro Advanced | 0.5 L/m2 |
*Expected durability is defined within the associated BBA Agrément certificate and is not a guarantee period
Please note: Sikalastic RoofPro Advanced can be used for various applications. Not all substrates would be suitable for all types of project. eg bitumen felt, paints, metals, etc, whilst acceptable for general roofing are unlikely to be suitable for applications with higher levels of access or foot traffic. Please consult Rawlins/Sika Technical Services for more information.
For ALL Systems
Note: The application of the system must be approached as one operation. Always plan for reasonable progress of each coat. Work only so far in advance that the existing surface can be overcoated as the next operation. Finish the coating system completely before progressing to the next area. The ideal time between coats is within 48 hours.
It is not good practice to plan breaks between coats of more than 7 days. For periods longer than this and less than 14 days the surface must be reactivated with Sika Reactivation Primer. Periods between coats longer than 14 days may affect the normal life term of the system –If this happens consult Sika for advice. Ensure each application/coat is clean and dry prior to overcoating
At no stage should the Sika system or waterproof coating in its finished or intermediate stage be used as a workspace or access floor without adequate protection.
*Please note: the above rates are for smooth substrates only.
Application Details
Substrate Quality
Cementitious substrates
New concrete should be cured for at least 28 days* and should have a pull off strength ≥1.5 N/mm2 . Inspect the concrete, including upstands, all areas should be hammer tested. Concrete must be suitably finished, preferably by wood float or steel pan. A power float finish is acceptable where the surface is prepared to avoid laitance (a tamped finish is not acceptable). The surface finish must be uniform and free from defects such as laitance, voids or honeycombing. The substrate must be of a suitable quality and condition to receive the system. Please refer to specification for further details.
Brick and stone
Bricks, blocks and mortar joints must be sound and preferably flush pointed.
Slates, tiles, etc.
Ensure all slates/tiles are sound and securely fastened, replacing obviously broken or missing sections and adequate cross ventilation is in place.
Asphalt
Asphalt can contain volatiles which may cause bleeding and slight non-detrimental staining. The asphalt must be carefully assessed for moisture and/or air entrapment, grade and surface finish prior to any coating works being carried out
Bituminous felt
Ensure that bituminous felt is firmly adhered or mechanically fixed to the substrate. Bituminous felt should not contain any badly degraded areas.
Metals
Metals must be in sound condition
Timber substrates
Timber and timber-based panel roof decks are to be well constructed, in good condition, firmly adhered, and with sufficient fixings for the nature and location of the site
Paints/Coatings
Ensure the existing material is sound and firmly adhered.
Existing Sikalastic RoofPro Advanced Systems
The existing Sikalastic RoofPro Advanced System should still be soundly adhered to the substrate.
Substrate Preparation
Cementitious substrates
Laitance, other loose friable material and weak concrete must be completely removed and surface defects such as blowholes and voids must be fully exposed. In severe cases use abrasive blast cleaning, grinding or scarifying equipment to achieve a sound surface.
Repairs to the substrate, filling of joints, blowholes/voids and surface levelling must be carried out using appropriate products.
High spots must be removed e.g. by grinding.
Outgassing is a naturally occurring phenomenon of concrete that can produce pinholes in subsequently applied coatings. The concrete must be carefully assessed for moisture content, air entrapment, and surface finish prior to any coating work. Any requirement for priming must also be considered. Installing the membrane either when the concrete temperature is falling or stable can reduce outgassing. It is generally beneficial, therefore, to apply the embedment coat in the late afternoon or evening
Brick and stone
Thoroughly clean by power wash and allow to dry. Where there is a risk of algal re-growth on absorbent surfaces use Sika Biowash. Please refer to the Sika Biowash Technical Datasheet for further information. Repair any spalling, flaking or other damage and replace any missing jointing.
Asphalt
Thoroughly clean by power wash and allow to dry. All major cracks should be sealed to allow continuity of the Sikalastic RoofPro Advanced System. Asphalt must be carefully assessed for moisture and/ or air entrapment, grade and surface finish prior to any coating works being carried out. Any priming requirement must also be considered
Bituminous felt
Thoroughly clean by power wash and allow to dry. Treat blisters by star cutting and removing any underlying water. Allow to dry and re-adhere using Decostik SP. Badly degraded areas should be replaced with Carrier Membrane bonded in Decostik SP.
Single ply
Various types of single ply sheeting can be coated. For further information please consult Sika Technical Services team.
Bituminous coatings
Remove loose, degraded, tacky or mobile coatings. Apply the Sikalastic RoofPro Advanced System directly.
Metals
Steelwork is ideally prepared to Sa2½ (Swedish Standard SIS 05: 5900 = 2nd quality BS4232 = S.S.P.C. grade SP10) OR as indicated by the blasting specification which may be of a higher standard. Where blasting to Sa2½ (Swedish Standard SIS 05: 5900 = 2nd quality BS4232 = S.S.P.C. grade SP10) is not permitted alternative blast media or clean metal preparation by pin hammer, etc. is acceptable. Less effective methods of preparation that leave corrosion in-situ may reduce expected life term.
Non-ferrous metals are prepared as follows. Remove any deposits of dust and oxidation and abrade to bright metal. Wire brushing can be used for soft metal such as lead. The surface must be clean and free from grease which, if present, must be removed with a proprietary solution. Wash with detergent, rinse and dry
Timber substrates
Timber and timber-based panel roof decks require a complete layer of Svap 5000E SA prior to the application of the chosen system. The substrate should then be treated as a felt roof. Small timber protrusions may be treated directly, provided that the timber is of exterior quality, e.g. marine plywood, (see Substrate Priming for further information).
Paints/Coatings
Remove loose or degraded coatings returning to a firm, feathered firm edge. Remaining coatings can only be overcoated if soundly adhered. Ensure the surface is clean and free from grease.
Existing Sikalastic® RoofPro Advanced Systems
Clean the membrane using a water jet at approximately 14N/mm2 (2000 p.s.i) using detergent and rinse thoroughly. Thoroughly clean by power wash and allow to dry.
Note: For the Waiting Time/Overcoating please refer to the technical datasheet of the appropriate cleaner/primer. Other substrates must be tested for their compatibility. If in doubt, apply a test area first.
Substrate Priming
Substrate | Primer |
---|---|
Cementitious Substrates | Sika Concrete Primer or Sika Bonding Primer, subject to surface assessment tests |
Brick and Stone | Not required |
Slate, tiles etc. | Not required |
Asphalt | Not required, subject to surface assessment tests |
Bituminous Felt | Not required |
Single Ply | "Adhesion to single ply may vary depending on type, age, etc. Consult Rawlins/Sika |
Technical for further advice on priming requirements." | |
Bituminous Coatings | Not required |
Metals | Sikalastic Metal Primer or Sika Primer 204N |
Timber Substrates | Timber-based roof decks require a layer of Carrier Membrane. For small areas of exposed timber (i.e. upstands) use Sika Bonding Primer or Quick Cure Primer, (exposed timber should be Marine ply to BS 1088 or equivalent). |
Paints | Subject to adhesion tests, Sika Bonding Primer or Sikalastic Metal Primer for aluminium based solar reflective coatings |
Existing Sikalastic | Sika Reactivation Primer |
Carrier Membrane | As specified |
Note: For the Waiting Time / Overcoating you should refer to the technical datasheet of the appropriate cleaner. Other substrates must be tested for their compatibility. If in doubt, apply a test area first.
Application Conditions / Limitations & Instructions
Substrate Temperature | 2°C min. / 30°C max. |
Ambient Temperature | 2°C min. / 30°C max. |
Substrate Moisture Content | Surfaces must be dry and not at risk of condensation forming. |
Please note: Reference should also be made to the appropriate primer technical datasheet. | |
Relative Air Humidity | 20% min. / 85% max. |
Dew Point | Beware of condensation. Surface temperature during application and cure must be a minimum of 3°C above dew point. |
Please note: metal surfaces will be more prone to temperature fluctuations occurring and wind chill effects. | |
Mixing | Gently stir the Sikalastic RoofPro Advanced before-use. |
Accelerated | Before use slightly stir the Sikalastic RoofPro Advanced then add the full Sika PU Accelerator unit (180ml Sika PU Accelerator for 15L of Sikalastic RoofPro Advanced) and stir using a drill and paddle until a uniform mix has been achieved. Over mixing must be avoided to minimise air entrapment. |
Application Method | Apply Sikalastic RoofPro Advanced using a roller (short pile mohair roller), brush(soft nylon or bristle brush). |
Cleaning of Tools | Clean all tools and application equipment with proprietary cleaning solvent immediately after use. Flush/wash equipment with cellulose thinners or xylene. |
Pot Life | The material in opened containers should be applied immediately as a surface film formation will happen within 1 - 2 hours. |
Curing Details
Applied Product ready for use
Temperature | Relative humidity | Rain resistant | Touch dry | Full cure |
---|---|---|---|---|
2°C | 50% | 12 hour | 20 hours | >24 hours |
10°C | 50% | 9 hour | 15 hours | 24 hours |
20°C | 50% | 6 hour | 10 hours | 18 hours |
Accelerated | ||||
2°C | 50% | 1.5 hours | 6-8 hours | |
20°C | 50% | 4 hours | 12-18 hours |
Note: Times are approximate and will be affected by changing ambient conditions.
Return-to-service times are provided as a guide only and may vary as a result of conditions. Newly installed balconies should be protected from exposure to heavy traffic by overlaying with an appropriate protective covering. This is particularly critical where early access is needed by other construction related traffic. Rawlins/Sika Ltd. will not be held responsible for damage to balcony surfaces that results from failures to adequately protect newly laid areas.
For further advice, consult Rawlins Technical or your local Sika Technical Manager
Typical Test Data - System
Flat Roof System | ||
---|---|---|
Dry Film Thickness (mm) | 1.5 | |
Tensile Strength (N/mm²) | 16.7 | N ISO 527 - 1/3 |
Tear Strength (N/30mm) | 550 | |
Tensile Elongation (%) | 20 | EN ISO 527 - 1/3 |
Tear Strength (N/mm) | 20 | |
Tear Force (N) | 30 |
Notes on Application / Limitations
Do not use Sikalastic RoofPro Advanced for indoor applications.
Substrate preparation is crucial to ensure durability. Please follow the instructions in the technical datasheet of the corresponding Primer and pre-treatment.
Applications of Sikalastic RoofPro Advanced in confined spaces must be undertaken in accordance with material safety datasheet recommendations.
Do not apply close to the air intake vents of running air conditioning units until either switched off or isolated as vapour may be drawn into the building.
All areas requiring anticorrosive protection must be installed over an appropriate metal primer that has been applied directly to bright metal.
All joints; areas subject to differential movement; guttering and drainage channels; and repairs; must be treated with local reinforcement.
Adhesion suitability must be verified practically on site prior to commencing contract. Refer to Rawlins/Sika recommendations and the Technical Data Sheet for installation guidance.
The application of the system must be approached as one operation. Always plan for reasonable progress of each coat. Work only so far in advance that the existing surface can be overcoated as the next operation. Finish the coating system completely before progressing to the next area. The ideal time between coats is within 48 hours.
It is not good practice to plan breaks between coats of more than 7 days. For periods longer than this and less than 14 days the surface must be reactivated with Sika Reactivation Primer. Periods between coats longer than 14 days may affect the normal life term of the system –If this happens consult Sika for advice. Ensure each application/coat is clean and dry prior to overcoating
Data sheet
- Manufacturer
- Sika
- For Use On
- Asbestos Cement
Brick
Stone
Lead
Copper
Aluminium
Brass
Stainless Steel
Metal
Bituminous Felt
Wood - Application Method
- Brush
Roller - Colour
- Standard / Ready Mixed
- Single, Two or Three Pack
- Single
- Pack Size
- 15L
- Parts
- 1
- Base Type
- Aliphatic Polyurethane
- Solvent
- Mixture - see data sheet
- Suitable Substrates
- Cementitious
Asbestos Cement
Brick
Stone
Lead
Copper
Aluminium
Brass
Stainless steel
Bright Galvanized Metal
Bituminous Felt
PVC/Plastisol Coated Roofs/PVF2
Wood - Key Features
- Waterproofing suitable for hot and cold climates.
- Application
- Brush, Roller
- Touch Dry (at 20°C)
- 10 hours
- Fully Cured (at 20°C)
- 18 hours
- Coverage
- From 0.5L/m², depending on substrate - see data sheet
- Recommended Thinner/Cleaner
- Cellulose thinners or Xylene
- Min. Application Temperature
- 2 °C
- Density
- ~1,32 kg/l (at 20 °C) (EN ISO 2811-1)
- Solids by Volume
- ~70,9 % (EN ISO 3251)
- UN Number
- UN1263
- Suitable For Use On
- Metal
- Suitable For Use On
- Brick
- Suitable For Use On
- Stone
- Suitable For Use On
- Wood
- Suitable For Use On
- Aluminium
- Suitable For Use On
- Stainless Steel
- Suitable For Use On
- Copper
- Suitable For Use On
- Bituminous Surfaces
- Suitable For Use On
- Lead
- Suitable For Use On
- Brass
- Suitable For Use On
- Asbestos Cement
- Application Method
- Brush
- Application Method
- Roller
- Manufacturer
- Sika
- Components
- 1K
- Product Range
- Sikalastic
- Categorised As
- Roof Paints > Low Temperature Roof Paints
- Seasonal
- Cold Weather
- Roof Type
- Flat & Pitched
Questions
Question about the product
jon Jordan on 2023-09-12 14:00:56 | Question:
Hi I all ready have your product on the roof but would like to redo. How do i go about putting another coat over the top. |
Answer from Rawlins’ Technical Team:
To reapply this product the roof must be clean, dry, sound and prepared as detailed in the technical data sheet. You would need to use the Sika Reactivation Primer prior to application. | |
chris hall on 2023-04-10 11:47:33 | Question:
Hi, I am considering using Sika roofpro D15 to overlay an existing GRP flat roof. Do I need to use a base coat and reemat with this system and finally a top coat. Thanks |
Answer from Rawlins’ Technical Team:
The Sikalastic RoofPro Advanced can be applied to the GRP roof directly without any primer but it is recommended that the surface is lightly abraded, then cleaned before installing the waterproofing system. The waterproofing system consists of a base coat of RoofPro Advanced with the Sika Reemat Premium embedded into it, once fully cured, a top coat of RoofPro Advanced applied. | |
IMPORTANT SHIPPING & DELIVERY INFORMATION
Sikalastic RoofPro Advanced is only available with the shipping and delivery timescales listed below - please do not contact our Customer Support Team with enquiries about alternative or earlier shipping and delivery times.
Saturdays and Sundays, as well as Bank Holidays, are not classed as working days.
Orders placed after the cut-off for this product will not be processed for earliest dispatch until 9am the next working day.
All delivery costs below are excluding VAT