Follow us on:

Tenmat FF108 Linear Gap Seals

TEN5045

This product is temporarily unavailable; please contact our technical team on 0113 2455450 (option 2) or send a message to [email protected] where we will be happy to find an alternative product.

Fully intumescent linear firestop seals tested to EN 1366-4. The durable seals are installed under compression and can accept up to 50% movement. They are equally suited to both vertical and horizontal joints. The seals offer up to 4 hour (EI240) fire rating for joints in fire rated walls and floors.

  • Up to EI240 Fire Rating
  • Compressible up to 50%
  • Available to suit gap sizes up to 100mm
  • Accepts joint movement
  • No additional sealants required
  • Note: some sizes are currently only available on a 2-3 week delivery service - please see below for more information
Item
£4.72(incl. VAT)
£3.93(ex. VAT)
Quantity
Product not available
Temporarily Out of Stock

Description
Ref Item Availability
LGS120X50-2 Linear Gap Seal 120x50x1000mm (2 Seal Required) 2-3 weeks
LGS120x60x1 Linear Gap Seals 120x60mm (1 Seal Required) 2-3 weeks
LGS15x15-1 Linear Gap Seals 15x15 mm (1 Seal Required) In Stock
LGS25x20-1 Linear Gap Seals 25x20 mm (1 Seal Required) In Stock
LGS25X20-2 Linear Gap Seal 25x20x1000mm (2 Seal Required) 2-3 weeks
LGS30X15-2 Linear Gap Seal 30x15x1000mm (2 Seal Required) 2-3 weeks
LGS40x20-1 Linear Gap Seals 40x20 mm (1 Seal Required) 2-3 weeks
LGS40X20-2 Linear Gap Seal 40x20x1000mm (2 Seal Required) 2-3 weeks
LGS60X40-2 Linear Gap Seal 60x40x1000mm (2 Seal Required) 2-3 weeks
LGS60x45-1 Linear Gap Seals 60x45mm (1 Seal Required) 2-3 weeks
LGS85X40-2 Linear Gap Seal 85x40x1000mm (2 Seal Required) 2-3 weeks
LGS85x45-1 Linear Gap Seals 85x45mm (1 Seal Required) 2-3 weeks



Quick Links - Click To Jump To Section:




Fire Rating


1 Seal Required

Seal Size Min. Gap Max. Gap Fire Rating: Floors Fire Rating: Walls
15x15mm 7.5 13 EI240/E190 EI240/E145
25x20mm 13 22 E240/EI30 E240
40x20mm 22 35 E240/EI30 E240
60x45mm 35 50 E240/EI45 E240/EI30
85x45mm 50 70 E240/EI45 E240/EI30
120x60mm 70 100 E240/EI45 E240/EI30

When installing in gaps/joints in floors, product must be installed 25mm down from the top of the floor slab.

When installing in walls, the product must be installed centrally.

  • Minimum Floor Slab Depth: 150mm
  • Minimum Wall Depth: 100mm
  • Tested to EN 1366-4: 2021
  • NB. Test evidence does not cover applications at the Head of Wall

2 Seals Required

Seal Size Min. Gap Max. Gap Fire Rating: Floors Fire Rating: Walls
30x15mm 15 25 EI240/E180 EI240/E180
25x20mm 13 22 EI240/E180 EI240/E120
40x20mm 22 35 EI240/E180 EI240/E120
60x40mm 35 50 EI240/E180 EI240/E120
85x40mm 50 70 EI240/E180 EI240/E120
120x50mm 70 100 EI240/E180 EI240/E120

When installing in gaps/joints in floors, top seal must be installed 100mm down from the top of the floor slab with an air gap of 50mm between the top and bottom seal.

When installing in walls, the 2no. seals must be installed centrally with a 50mm air gap between the seals. Butt joints in adjacent seals must be offset by minimum 500mm.

  • Minimum Floor Slab Depth: 250mm
  • Minimum Wall Depth: 250mm
  • Tested to EN 1366-4: 2006 +A1 2010
  • NB. Test evidence does not cover applications at the Head of Wall

In all cases:

  • Substrates covered include aerated concrete, concrete, blockwork and masonry separating elements (floors and walls) of a thickness and density equal to or greater than 670kg/m3
  • All butt joints must be a very tight friction fit with no gaps



Examples of Projects


Student Accomodation:

  • Student Castle, Manchester
  • Downing Plaza, Newcastle
  • Holyrood, Edinburgh
  • Eastern Boulevard, Leicester
  • College Lane, Hatfield
  • Wallscourt Park, UWE

Hotels/Commercial

  • Hotel Football, Old Trafford
  • BBC Media City, Salford
  • Premier Inn, Multiple Locations

 

Residential

  • Berkshire House, Maidenhead
  • Commonwealth Games, Glasgow
  • One Tower Bridge, London
  • Anglican Retirement Village, Castle Hill, Sydney

Medical and Healthcare

  • RLUH — Royal Liverpool University Hospital
  • Oncology Hospital, Palermo, Italy



IMPORTANT FIRE PRODUCTS NOTICE: The information displayed on this website should be used as a guide ONLY and our Technical Department should be contacted to obtain a tailored specification and any advice necessary before you place an order for fire protection products. Fire protection products are non-returnable except in accordance with Condition 8 of the Terms and Conditions and should be applied only by an individual with the necessary expertise and experience. We will not be held liable for any resulting damage to property, human life or monetary costs incurred due to the incorrect specification you have prepared or use of fire protection products caused by your negligence, including your failure to have contacted us to obtain the relevant advice/specification.

Product Details
5045-807520

Data sheet

For Use By
Professional Use
Interior / Exterior Use
Exterior Use
Single, Two or Three Pack
Single
Product Usage Type
Fire Seal
Attachments
Download


Customer agrees that before placing an Order, Customer has read and understood the most up to date Product Data Sheet for the Product. Where we have access to the Product Data Sheet from the manufacturer, we will either provide a copy on request, or include a link to the Product Data Sheet available on the manufacturer’s website. Customer further agrees that we have no liability for any errors or omissions contained within the Product Data Sheets. For more information, please see our Terms & Conditions of Sale.


Be the first to ask a question about this product!


Question about the product

* Required fields
(read)
Send

IMPORTANT SHIPPING & DELIVERY INFORMATION

Tenmat FF108 Linear Gap Seals is only available with the shipping and delivery timescales listed below - please do not contact our Customer Support Team with enquiries about alternative or earlier shipping and delivery times.

Saturdays and Sundays, as well as Bank Holidays, are not classed as working days.

Orders placed after the cut-off for this product will not be processed for earliest dispatch until 9am the next working day.

All delivery costs below are excluding VAT