Thixotropic epoxy putties for levelling concrete surfaces, for structural bonding, reinforced concrete or masonry surfaces before applying MapeWrap fabrics.
- The two products differ from each other only for the workability time: MapeWrap 11 is suitable for applications at temperatures between 5°C and 23°C, while MapeWrap 12 is recommended in hot climates
- For professional use only
MapeWrap 11 and MapeWrap 12 are two-component epoxy resin based products with selected fine graded aggregates and special additives.
Quick Links - Click To Jump To Section:
- Technical Characteristics
- Recommendations
- Application Procedure
- Precautions To Be Taken During And After Application
- Cleaning
- Consumption
- Technical Data
Technical Characteristics
After mixing MapeWrap 11 component A or MapeWrap 12 component A with their relative hardener (component B), they become a thixotropic paste, easy to apply both on vertical surfaces and on soffits.
The two products differ from each other only for the workability time: MapeWrap 11 is suitable for applications at temperatures between +5°C and +23°C, while MapeWrap 12 is recommended in hot climates.
MapeWrap 11 and MapeWrap 12 harden without shrinkage, becoming extremely tacky and mechanically strong. MapeWrap 11 and MapeWrap 12 respond to the principles defined in EN 1504-9 (“Products and systems for protecting and repairing concrete structures: definitions, requirements, quality control and conformity evaluation. General principles for the use and application of systems”), and the minimum requirements for EN 1504-4 (“Structural bonding”).
Recommendations
- MapeWrap 11 and MapeWrap 12 must not be used on wet surfaces
- MapeWrap 11 and MapeWrap 12 must not be used on dirty or crumbling surfaces
Application Procedure
Preparing the substrate
Treat the substrate with MapeWrap Primer 1 before applying MapeWrap 11 or MapeWrap 12.
Preparing the mixes
The two components of MapeWrap 11 and MapeWrap 12 must be mixed together. Pour component B (white) into component A (grey) and mix with a slow speed drill fitted with a stirrer until the resin is completely homogeneous (completely grey). The products come already pre-dosed therefore do not use partial quantities to avoid the risk of accidental ratio errors that could prevent MapeWrap 11 and MapeWrap 12 from hardening. If only partial quantities an required, use a high-precision electronic scale.
Applying the mixes
MapeWrap 11 and MapeWrap 12 can be applied on concrete, stone, brick or metal with a flat trowel after the substrate has been primed with MapeWrap Primer 1.
In order to obtain good levelling, it is recommended to let the product penetrate well into particularly uneven areas.
Apply, with a notched trowel, approximately a 1 mm layer of MapeWrap 11 or MapeWrap 12, depending on the temperature, over the still fresh MapeWrap Primer 1. Use a flat trowel to completely level even the most uneven parts of the surface.
Use the same product to fill and round the corners in order to create a profile with a bending radius not less than 2 cm. MapeWrap 11 or MapeWrap 12 must be applied within their pot-life, therefore timing is vital in order to use the whole pack within the given time.
The MapeWrap fabrics must be applied over the still fresh MapeWrap 11 or MapeWrap 12.
Precautions To Be Taken During And After Application
No special precautions need to be taken at temperatures between 5°C and 30°C. In hot weather do not expose the material to direct sunlight. Levelling should be carried out during the cooler hours.
Cleaning
Due to the strong adhesion of MapeWrap 11 and MapeWrap 12 also on metal, it is recommended to wash the working tools with solvents (ethyl alcohol, toluol, etc.) before the product dries.
Consumption
1.55 kg/m² per mm of thickness.
Technical Data
Data sheet
- Manufacturer
- Mapei
- For Use By
- Professional Use
- For Use On
- Concrete
- For Use On
- Masonry
- Single, Two or Three Pack
- Two-Pack
- Pack Size
- 6KG
- Mixing Ratio
- A:B - 3:1
- Coverage
- 1.55 kg/m² per mm of thickness.
- Max. Application Temperature
- MapeWrap 11 & MapeWrap 12: 30°C
- Min. Application Temperature
- MapeWrap 11: 5°C
MapeWrap 12: 10°C - Density
- 1.72 (A)
1.55 (B)
1.70 (Mixed) - Suitable For Use On
- Masonry
- Suitable For Use On
- Concrete
- Manufacturer
- Mapei
- Product Usage Type
- Adhesive
- Product Range
- Mapewrap
- Workability Time
- MapeWrap 11: 25-60 minutes
MapeWrap 12: 35-150 minutes - Setting Time
- MapeWrap 11: 90 mins-8 hours
MapeWrap 12: 2 1/2 hours - 16 hours - Hardening
- 7 days
- Colour Family
- Grey
Questions
Question about the product
Be the first to ask a question about this product!
IMPORTANT SHIPPING & DELIVERY INFORMATION
Mapei Mapewrap 11 & 12 is only available with the shipping and delivery timescales listed below - please do not contact our Customer Support Team with enquiries about alternative or earlier shipping and delivery times.
Saturdays and Sundays, as well as Bank Holidays, are not classed as working days.
Orders placed after the cut-off for this product will not be processed for earliest dispatch until 9am the next working day.
All delivery costs below are excluding VAT